BP PLAN CHECK
4. Will your business store or handle carcinogens/reproductive toxins in any quantity?:
No
1. If your business type was listed and selected in the table above, answer 'Yes' to this question:
Yes
2. Will your facility/business generate Hazardous Waste and/or Medical Waste in any amount?:
No
3. Will your business store or handle Hazardous Materials in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet?:
No
4. Will your business use an existing or install an underground storage tank?:
No
5. Will your business store or handle Regulated Substances (CalARP)?:
No
6. Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?:
No
7. Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act)?:
No
PROJECT DETAILS
Briefly describe business activities:
Tele com cell site
Briefly describe the proposed project:
TI: Modify antennas
FD OCCUPANCY CLASSIFICATION
1. Explosive and Blasting Agents:
No
2. Compress Gasses:
No
3. Flammable/Combustible Liquids:
No
4. Flammable Solids:
No
5. Organic Peroxides:
No
6. Oxidizers:
No
7. Pyrophorics:
No
8. Unstable Reactives:
No
9. Water Reactives:
No
10. Cryogenics:
No
11. Highly Toxic or Toxic Materials:
No
12. Radioactives:
No
13. Corrosives:
Yes
14. Other Health Hazards:
No
AIR POLLUTION CONTROL (APCD)
1. Will the project disturb 100 square feet or more of existing building materials? If 'Yes', an asbestos survey will need to be emailed to the APCD at: apcdcomp@sdcounty.ca.gov.:
No
2. Will any load supporting structural members be removed?
If 'Yes', an asbestos survey will need to be emailed to the APCD at: apcdcomp@sdcounty.ca.gov. A notification may be required at least 10 working days prior to commencing demolition.
If 'Yes', contact APCD prior to the issuance of a building or demolition. A notification may be required at least 10 working days prior to commencing asbestos removal.:
No
3. (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved building inspector course?:
No
4. (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to the removal of a load supporting structural member(s) regardless of the presence of asbestos.:
No
5. Will the project or associated construction equipment emit air contaminants? If yes, contact APCD prior to issuance of a building permit.:
No
6. (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school boundary?:
No